Linking project health to project performance indicators: Multiple case studies of construction projects in Saudi Arabia

File Size Format
74103_1.pdf 609Kb Adobe PDF View
Title Linking project health to project performance indicators: Multiple case studies of construction projects in Saudi Arabia
Author Almahmoud, Essam Salem; Doloi, Hemanta Kumar; Panuwatwanich, Kriengsak
Journal Name International Journal of Project Management
Editor J. Rodney Turner
Year Published 2011
Place of publication United Kingdom
Publisher Elsevier
Abstract This research presents an empirical study of the relationship between project health and project performance in the project delivery context. Based on an existing Project Health Check (PHC) framework, the relationship has been tested in terms of a set of predefined indicators through the use of case study approach. The Swiss Cheese model was employed as a guiding principle to represent the links between PHC indicators and project Key Performance Indicators (KPIs). Three cases of construction projects in Saudi Arabia were investigated through a comprehensive review of the project performance history, using current performance indicators to establish the first slice of the Swiss Cheese model. PHC assessments were then conducted to shape the second slice of the model, which represent the maturity level of the project management. The relationships between the two slices were obtained from semi-structured interviews with the project managers. These relationships were analysed qualitatively by tracking patterns across the three cases. The result was used to develop the Swiss Cheese Performance Management Framework, which can potentially serve to help project managers identify the root causes of any shortcomings at the early stage in the project delivery process. This in turn can assist project managers in managing the overall project performance more effectively.
Peer Reviewed Yes
Published Yes
Alternative URI http://dx.doi.org/10.1016/j.ijproman.2011.07.001
Copyright Statement Copyright 2011 Elsevier. This is the author-manuscript version of this paper. Reproduced in accordance with the copyright policy of the publisher. Please refer to the journal's website for access to the definitive, published version.
Volume n/a
Issue Number n/a
Page from 1
Page to 12
ISSN 0263-7863
Date Accessioned 2011-11-10; 2012-02-08T00:51:42Z
Date Available 2012-02-08T00:51:42Z
Research Centre Centre for Infrastructure Engineering and Management
Faculty Faculty of Science, Environment, Engineering and Technology
Subject Construction Engineering
URI http://hdl.handle.net/10072/42391
Publication Type Journal Articles (Refereed Article)
Publication Type Code c1

Brief Record

Griffith University copyright notice